Part 6 Hall Cape Cod

The house has been set by 11:00. The crane is getting set to leave. After lunch the windows are set upstairs, along with framing of rooms upstairs.


Part 5 Hall Cape Cod

After the 2nd floor, and roof has been raised, the crew sets the dormer into place.


Red Tree video detailing the benefits of system built homes and how they are sustainable and efficient

Sunday, September 13, 2009

Part 4 Hall Cape Cod

August 25, 2009 part 4 This video shows the inside finished.



Saturday, September 12, 2009

Part 3 Hall Cape Cod

August 25, 2009 Part 3 This video shows the house being picked up and set. House is set on foundation in less than 6 minutes.


Part 2 Hall Cape Cod

August 25, 2009 Part 2.
This video shows the prep work before the house is moved onto the foundation.

Friday, September 11, 2009

Part 1 Hall Cape Cod House

August 25, 2009 part 1 showing setting of Chris and Misty Hall's cape cod house in Burnsville, NC. House was set by 10:30, and in the dry by 6:00 same day. This video shows the house being positioned for the crane.


Thursday, September 10, 2009

Hall Grading Video

Hall House.

We have started a NC Healthy-Built house in Burnsville, N.C. I thought it would be cool to put together a video series of the house. The first video is of when grading started. Then I will continue to add videos that show the house being set on the foundation, the finishing of the inside, the site built garage/laundry room, and end it up with finished house. I'm planning on having this house done by November. That is right under 5 months. I think you will be very impressed with this house. Remember building green doesn't mean you have to spend a ton more money, which is easily is recovered and saved over the years on energy savings, and increased value of home.